|
|
|
|
|
|
|
|
2
|
Rail Coach Factory
awards Tender
of
76.43 Million approx. / 7.64 Crore approx.
for
Supply of underframe complete for lhb scn amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing ls11256 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb gs amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lg11450 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb slrd amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lr11991 alt. 'nil', packing instruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier., quality plan 0 [ warranty period 84 months after the date of delivery ]
| Completion On
7-Feb-2025
| Location:
Punjab
|
TRID:
7607559
| Like
  |
Ask Expert
|
|
|
|
|
|
|
|
|
|
|
3
|
Rail Coach Factory
awards Tender
of
22.03 Million approx. / 2.20 Crore approx.
for
Supply of underframe complete for lhb scn amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing ls11256 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb gs amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lg11450 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb slrd amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lr11991 alt. 'nil', packing instruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier., quality plan 0 [ warranty period 84 months after the date of delivery ]
| Completion On
8-Jan-2025
| Location:
Punjab
|
TRID:
7607560
| Like
  |
Ask Expert
|
|
|
|
|
|
|
|
|
|
|
4
|
Rail Coach Factory
awards Tender
of
14.84 Million approx. / 1.48 Crore approx.
for
Supply of underframe complete for lhb scn amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing ls11256 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb gs amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lg11450 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb slrd amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lr11991 alt. 'nil', packing instruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier., quality plan 0 [ warranty period 84 months after the date of delivery ]
| Completion On
14-Jan-2025
| Location:
Punjab
|
TRID:
7652214
| Like
  |
Ask Expert
|
|
|
|
|
|
|
|
|
|
|
|
View your First Tender on TenderTiger Mobile App, Absolutely Free.
|
- Download TenderTiger App from Google Play Store (Android Version) & Apple iStore (IOS Version) & Windows Phone Store (Windows Version).
- Join our Public group on Various Product/Services (Tiger Group)
- Select Tender you wish to view.
|
If you don’t have smart phone, please feel free to join our Web/Email group as well.Join now.
|
|
|
|
|
|
|