The Global Tender Result Portal
Searching Tenders? Get daily alerts. Register / Call now
Advance Search
1 Ircon International Limited awards Tender of  INR 7.48 Billion approx. / 748.85 Crore approx. for Manufacture, supply, transportation of jis 60kg rails, jis 50kgn rails standard, 25m length as per jis e 1101 and 60 to 50 kg compromise rails, 10m length on cif li/lo terms at hazira port, surat, india for high speed rail project mahsr t2 | Completion On 24-Feb-2026 | Location: Gujarat | TRID: 3433753  | Like   |  Ask Expert
2 Rail Coach Factory awards Tender of  INR 76.43 Million approx. / 7.64 Crore approx. for Supply of underframe complete for lhb scn amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing ls11256 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb gs amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lg11450 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb slrd amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lr11991 alt. 'nil', packing instruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier., quality plan 0 [ warranty period 84 months after the date of delivery ] | Completion On 7-Feb-2025 | Location: Punjab | TRID: 7607559  | Like   |  Ask Expert
3 Rail Coach Factory awards Tender of  INR 22.03 Million approx. / 2.20 Crore approx. for Supply of underframe complete for lhb scn amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing ls11256 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb gs amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lg11450 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb slrd amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lr11991 alt. 'nil', packing instruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier., quality plan 0 [ warranty period 84 months after the date of delivery ] | Completion On 8-Jan-2025 | Location: Punjab | TRID: 7607560  | Like   |  Ask Expert
4 Rail Coach Factory awards Tender of  INR 14.84 Million approx. / 1.48 Crore approx. for Supply of underframe complete for lhb scn amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing ls11256 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb gs amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lg11450 alt. 'nil', packinginstruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 84 months after the date of delivery ]underframe complete for lhb slrd amrit bharat coaches note-(1)firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway. (2)special condition as per annexure-abc dy cple-iii letter no. rcf/hsq/plg/mpsh/510003 dated 27/05/2024., as per drawing lr11991 alt. 'nil', packing instruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier., quality plan 0 [ warranty period 84 months after the date of delivery ] | Completion On 14-Jan-2025 | Location: Punjab | TRID: 7652214  | Like   |  Ask Expert
5 Rail Coach Factory awards Tender of  INR 9.82 Million approx. / 98.25 Lakh approx. for Supply of integrated wtcc
integrated wtcc for lhb gs & scn amrit bharat coaches note-firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway., as per drawing lg10486 alt. 'a', packing instruction 1. the supplier shall pack the integrated wtcc in a suitably designed returnable fixture in such a way that integrated wtcc shall not get scratched, damaged, twisted during transportation, storage and lifting and to avoid scratches on outer surface. it should be wrapped with enviroment friendly material and it should have standard clamping /fastening mechanism so that it can be opened easily. it should have firm's identification mark. 2. first returanable fixture along with integrated wtcc be retained by rcf & this fixture shall be exchanged in the second lot supply and so on. at the end of the contact, the firm shall collect the remaining returnable packing fixture from rcf. 3. the packing fixture/frame to be fabricated having sufficient strenght to bear approximate 1 tonne load in static & moving condition of two coach setof integrated wtcc. 4. the fixture /frame/pallet should be designed so that the pac
| Completion On 5-Dec-2024 | Location: Punjab | TRID: 7278472  | Like   |  Ask Expert
6 Rail Coach Factory awards Tender of  INR 6.55 Million approx. / 65.50 Lakh approx. for Supply of integrated wtcc
integrated wtcc for lhb gs & scn amrit bharat coaches note-firm shall collect all latest/final drawings before manufacturing. there may be minor modification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway., as per drawing lg10486 alt. 'a', packing instruction 1. the supplier shall pack the integrated wtcc in a suitably designed returnable fixture in such a way that integrated wtcc shall not get scratched, damaged, twisted during transportation, storage and lifting and to avoid scratches on outer surface. it should be wrapped with enviroment friendly material and it should have standard clamping /fastening mechanism so that it can be opened easily. it should have firm's identification mark. 2. first returanable fixture along with integrated wtcc be retained by rcf & this fixture shall be exchanged in the second lot supply and so on. at the end of the contact, the firm shall collect the remaining returnable packing fixture from rcf. 3. the packing fixture/frame to be fabricated having sufficient strenght to bear approximate 1 tonne load in static & moving condition of two coach setof integrated wtcc. 4. the fixture /frame/pallet should be designed so that the pac
| Completion On 5-Dec-2024 | Location: Punjab | TRID: 7278474  | Like   |  Ask Expert
7 Rail Coach Factory awards Tender of  INR 3.55 Lakh approx. for Supply of flat connecting(with wago connecttrs)
flat connecting(with wago connecttrs)as per list no edml014, as per drawing edml014,rev-b., packing instruction as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period 30 months after the date of delivery ] ]
| Completion On 28-Feb-2025 | Location: Punjab | TRID: 7554980  | Like   |  Ask Expert
Set Free email Alert    >> RAIL ACCESSORIE...
Sort By   
Search Within Search Within